Talk to the drum yard
Whether you are tipping a stream you would rather recover or buying a grade you cannot source elsewhere, the desk will connect you to the right part of CIRCULATE RESOURCES LIMITED.
Describe your stream and we will reply
Give us the material type, the approximate tonnage and the site location. If you prefer, the form will open your own email client with the message ready to send.
Three things people ask before a first visit
Short answers to the questions that come up most often at the yard gate.
Yes. We regularly scope loops for operators elsewhere and can design the recovery line locally while the physical drums are installed on your site. For material that must cross a border, our compliance and chain-of-custody service assembles the transport and treatment records in advance.
Absolutely. Most clients begin with one problematic stream, prove the economics, and add lines later. A single-stream engagement is designed the same way as a full yard, with the same telemetry and grade specification, just at a smaller scale.
A survey and first-pass design typically take two to three weeks. A simple recovery line with telemetry can be commissioned in six to ten weeks once the build plan is agreed. Managed stewardship starts the day the line passes its first calibrated batch.
Ready to walk the yard?
Appointments are available Monday to Friday. Bring a sample and we will run it through the drum while you watch.